Further Development of Integer Programming in Earthwork Optimization
- 1 March 1990
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 116 (1) , 18-34
- https://doi.org/10.1061/(asce)0733-9364(1990)116:1(18)
Abstract
The objective of existing linear programming methods of earthwork‐system optimization in road construction has been either minimizing the cost or maximizing profit, generally without considering the project duration. This paper develops a linear programming model incorporating the project duration. The model attempts to optimize a comprehensive earthmoving system in road construction by comparing alternative fleets (from available fleets) to provide an optimum material distribution and appropriate plant fleets to complete a project within the specified time. The situations where different degrees of compaction, availability of various soil strata at cut sections and borrow pits, and selection of borrow/disposal sites are also incorporated. Among the possible extensions, equipment sharing between fleets and sequence of operations present at cut and fill sections are examined. The validity of the model is demonstrated by applying it to a numerical example, providing additional tools to the management such as the minimum project‐completion time, the cheapest project cost and corresponding duration achievable with available resources.Keywords
This publication has 5 references indexed in Scilit:
- Earthwork Allocations with Linear Unit CostsJournal of Construction Engineering and Management, 1988
- Earthwork Allocations with Nonconstant Unit CostsJournal of Construction Engineering and Management, 1987
- Earthmoving LogisticsJournal of the Construction Division, 1981
- Earthwork Transportation Allocations: Operations ResearchJournal of the Construction Division, 1981
- Analytical Methods in Transportation: Planning a Grading Operation for Least Total CostJournal of the Engineering Mechanics Division, 1963