Field Experience with Absolute Time Synchronism Between Remotely Located Fault Recorders and Sequence of Events Recorders
- 1 July 1984
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Apparatus and Systems
- Vol. PAS-103 (7) , 1739-1742
- https://doi.org/10.1109/tpas.1984.318676
Abstract
This paper addresses the problem of maintaining absolute real time synchronism between many remote substation locations containing fault and sequence of events recording equipment. Several methods are described which have been under field evaluation for over four years and are in current use at Georgia Power Company.Keywords