Measures of risk importance and their applications. [PWR; BWR]
- 1 July 1983
- report
- Published by Office of Scientific and Technical Information (OSTI)
Abstract
This work is part of a project being conducted for the Division of Risk Analysis (DRA) of the Nuclear Regulatory Commission (NRC). The objectives of the project are to evaluate the importances of containment, the different safety functions, and other various contributers as assessed in probabilistic risk analyses and to identify generic conclusions regarding the importances. Effective display of the importances is an important part of these objectives. To address these objectives, measures of risk importance need to be first identified and then they need to be evaluated for the different risk analyses which have been performed. This report describes the risk importance measures that were defined and were applied to the risk analyses which were performed as part of the Reactor Safety Study Methodology Applications Program (RSSMAP). The risk importance measures defined in this report measure the importance of features not only with regard to risk reduction but also with regard to reliability assurance, or risk maintenance. The goal of this report is not to identify new mathematical formulas for risk importance but to show how importance measures can be interpreted and can be applied.Keywords
This publication has 0 references indexed in Scilit: