Causes of Quality Deviations in Design and Construction
- 1 March 1992
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 118 (1) , 34-49
- https://doi.org/10.1061/(asce)0733-9364(1992)118:1(34)
Abstract
Quality deviation data are collected from nine fast‐track industrial construction projects. The data are collected after the construction phase of the projects and identify the direct costs associated with rework (including redesign), repair, and replacement. Analyses of the data indicate that deviations on the projects accounted for an average of 12.4% of the total project costs. Furthermore, design deviations average 78% of the total number of deviations, 79% of the total deviation costs, and 9.5% of the total project cost. Construction deviations average 16% of the total number of deviations, 17% of the total deviation costs, and 2.5% of the total project cost. These values are conservative because they consider only direct costs, but they are indications of the areas that cause the greatest impact on total project costs. By applying the procedures presented in this paper to its historical records, a company can identify not only its deviation costs, but also the most likely areas on which to focus to reduce these costs on future projects.Keywords
This publication has 2 references indexed in Scilit:
- Measuring Design and Construction Quality CostsJournal of Construction Engineering and Management, 1989
- Construction Claims: Frequency and SeverityJournal of Construction Engineering and Management, 1985