COST INCREASES DUE TO DEMAND UNCERTAINTY IN MRP LOT SIZING
- 1 July 1983
- journal article
- Published by Wiley in Decision Sciences
- Vol. 14 (3) , 345-362
- https://doi.org/10.1111/j.1540-5915.1983.tb00190.x
Abstract
No abstract availableKeywords
This publication has 13 references indexed in Scilit:
- Lot sizing and safety stock decisions in an MRP system with demand uncertaintyEngineering Costs and Production Economics, 1982
- The impact of a rolling schedule in a multi‐level MRP systemJournal of Operations Management, 1982
- Improved Heuristics for Multi-Stage Requirements Planning SystemsManagement Science, 1982
- THE EFFECTIVENESS OF EXTENDING THE HORIZON IN ROLLING PRODUCTION SCHEDULINGDecision Sciences, 1982
- An analysis of terminal conditions in rolling schedulesEuropean Journal of Operational Research, 1981
- HEURISTIC LOT‐SIZING PERFORMANCE IN A ROLLING‐SCHEDULE ENVIRONMENT*Decision Sciences, 1980
- An Analytic Framework for Evaluating Rolling SchedulesManagement Science, 1979
- HEURISTIC LOT‐SIZING AND SEQUENCING RULES IN A MULTISTAGE PRODUCTION‐INVENTORY SYSTEMDecision Sciences, 1979
- AN EXPERIMENTAL STUDY OF THE EFFECTIVENESS OF ROLLING SCHEDULES IN PRODUCTION PLANNINGDecision Sciences, 1977
- Dynamic Version of the Economic Lot Size ModelManagement Science, 1958