A due-date assignment model for a flow shop with application in a lightguide cable shop
- 31 December 1991
- journal article
- Published by Elsevier in Journal of Manufacturing Systems
- Vol. 10 (1) , 1-7
- https://doi.org/10.1016/0278-6125(91)90042-z
Abstract
No abstract availableKeywords
This publication has 11 references indexed in Scilit:
- Approximations for the time spent in a dynamic job shop with applications to due-date assignmentInternational Journal of Production Research, 1988
- Multiproduct Queueing Networks with Deterministic Routing: Decomposition Approach and the Notion of InterferenceManagement Science, 1988
- Lot Sizes, Lead Times and In-Process InventoriesManagement Science, 1987
- MPCS-The Manufacturing Process Control SystemAT&T Technical Journal, 1986
- Lotsizing in Multi-Item Multi- Machine Job ShopsIIE Transactions, 1985
- The time spent in a dynamic job shopEuropean Journal of Operational Research, 1984
- The Queueing Network AnalyzerBell System Technical Journal, 1983
- The Effect of Workload Dependent Due-Dates on Job Shop PerformanceManagement Science, 1983
- A Comparison of Due-Date Selection RulesA I I E Transactions, 1981
- Open queueing network models of dynamic job shopsInternational Journal of Production Research, 1981