Resource constrained scheduling of hierarchically structured design activity networks
- 1 May 1995
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Engineering Management
- Vol. 42 (2) , 150-158
- https://doi.org/10.1109/17.387271
Abstract
No abstract availableThis publication has 12 references indexed in Scilit:
- Manufacturing Information SystemsPublished by Wiley ,1994
- Reengineering of design and manufacturing processesComputers & Industrial Engineering, 1994
- Development of a knowledge-based manufacturing modelling system based on IDEFO for the metal-cutting industryInternational Journal of Production Economics, 1994
- A state of the art review of IDEFOInternational Journal of Computer Integrated Manufacturing, 1993
- Evaluation Functions For Assembly Sequence PlanningPublished by SPIE-Intl Soc Optical Eng ,1989
- Project scheduling with resource constraints: A branch and bound approachEuropean Journal of Operational Research, 1987
- Computational algorithms for hierarchically structured project networksOperations Research Letters, 1982
- An Algorithm for Project (Job) Sequencing with Resource ConstraintsOperations Research, 1972
- Machine Sequencing Via Disjunctive Graphs: An Implicit Enumeration AlgorithmOperations Research, 1969
- An Algebra for the Analysis of Generalized Activity NetworksManagement Science, 1964