Abstract
A method is shown analytically which reduces the effects of epoxy shrinkage for an ultra-high precision X-ray telescope to within the system error budget. The three-dimensional shrinkage effects are discussed with reference to this telescope. The results of the analysis point to the use of an interrupted rather than continuous bond line as the best solution. Discussion of the finite element modelling techniques is included.

This publication has 0 references indexed in Scilit: