Micro-Purge Low-Flow Sampling of Uranium-Contaminated Ground Water at the Fernald Environmental Management Project
- 1 August 1995
- journal article
- Published by Wiley in Ground Water Monitoring & Remediation
- Vol. 15 (3) , 168-176
- https://doi.org/10.1111/j.1745-6592.1995.tb00550.x
Abstract
No abstract availableKeywords
This publication has 12 references indexed in Scilit:
- Reproducible Well‐Purging Procedures and VOC Stabilization Criteria for Ground‐Water SamplingGroundwater, 1994
- Passive sampling of groundwater monitoring wells without purging: multilevel well chemistry and tracer disappearanceJournal of Contaminant Hydrology, 1993
- Acquisition of Representative Ground Water Quality Samples for MetalsGround Water Monitoring & Remediation, 1992
- Suggested Modifications to Ground Water Sampling Procedures Based on Observations from the Colloidal BorescopeGround Water Monitoring & Remediation, 1992
- Well‐Purging Criteria for Sampling Purgeable Organic CompoundsGroundwater, 1990
- Filtration of Ground Water Samples for Metals AnalysisHazardous Waste and Hazardous Materials, 1989
- Investigations of Techniques for Purging Ground-Water Monitoring Wells and Sampling Ground Water for Volatile Organic CompoundsPublished by ASTM International ,1988
- Field Evaluation of Well Purging ProceduresGround Water Monitoring & Remediation, 1987
- Monitoring Well Installation, Purging, and Sampling Techniques ‐ Part 1: ConceptualizationsGroundwater, 1987
- MONITORING SAMPLING PROTOCOL CONSIDERATIONSGround Water Monitoring & Remediation, 1983