The effects of performance time variance on a balanced, four-station manual assembly line
- 1 October 1973
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 11 (4) , 341-353
- https://doi.org/10.1080/00207547308929984
Abstract
Production for a four-station manual assembly line, notionally balanced with respect to station service time means and unpaced in the mechanical sense is simulated in order to determine the effects of station service time variance on operating characteristics of the line. A deeper insight into this problem than has been reported in previous research is presented for small assembly line operation. Details of operating characteristics, including production rate, idle time and buildup of inter-process stock, are measured against station service time variance over a wide spectrum of levels and varying conditions.Keywords
This publication has 7 references indexed in Scilit:
- A note on the operating characteristics of‘ balanced’ and ‘ unbalanced’ production flow linesInternational Journal of Production Research, 1972
- Aspects of assembly line balancingInternational Journal of Production Research, 1971
- PACING EFFECTS ON MANNED ASSEMBLY LINESInternational Journal of Production Research, 1965
- Assembly-Line Balancing—Dynamic Programming with Precedence ConstraintsOperations Research, 1963
- A Review of Analytical Systems of Line BalancingOperations Research, 1962
- Assembly-Line Balancing by Linear ProgrammingOperations Research, 1960
- A Computing Procedure for a Line Balancing ProblemManagement Science, 1956