Routine Maintenance and Pavement Performance
- 1 July 1986
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Transportation Engineering
- Vol. 112 (4) , 329-344
- https://doi.org/10.1061/(asce)0733-947x(1986)112:4(329)
Abstract
A study of the relationship between pavement performance and routine maintenance is presented. A concept for deriving this relationship is described. This concept introduces two parameters to represent quantitatively pavement performance and level of pavement routine maintenance. An application of the concept is illustrated by means of a case study based upon the data of the state highway system of Indiana. Statistical correlation and regression analyses were performed to examine the relationship between the two quantitative parameters. A total of seventy‐five highway routes were analyzed. These included six rigid pavement, ten overlay pavement and fifty‐nine flexible pavement routes.Keywords
This publication has 4 references indexed in Scilit:
- Development of a Method for Establishing Resurfacing Priorities for the Pavement Management in Indiana: Volume 3, AppendicesPublished by Purdue University Press ,1984
- Framework for a Pavement Evaluation System : Interim ReportPublished by Purdue University Press ,1981
- Appendices for the Report: Comparison of Different Methods of Measuring Pavement Conditions, NCHRP Project 1-2, later published in NCHRP Report 7Published by Purdue University Press ,1964
- Serviceability Ratings of Highway Pavements : Technical PaperPublished by Purdue University Press ,1962