120-GeV Proton Transport for Antiproton Production in the Fermilab Tevatron I Project

Abstract
Short bunches of 120 GeV protons will be used for the production of 8 GeV antiprotons. Protons will be extracted vertically from the Main Ring using two high field Lambertson type magnets at location F17. The beam transport is made of three sections: horizontal dispersion cancellation, vertical dispersion cancellation and final focusing. The final focusing section is composed of two quadrupole doublets and allows for variation in ß values at the target from 1.5 m to 20.0 m.

This publication has 1 reference indexed in Scilit: