Scheduling a Metacomputer with Uncooperative Sub-schedulers
- 1 January 1999
- book chapter
- Published by Springer Nature
- p. 179-201
- https://doi.org/10.1007/3-540-47954-6_10
Abstract
No abstract availableKeywords
This publication has 27 references indexed in Scilit:
- Solving Scheduling Problems by Simulated AnnealingSIAM Journal on Control and Optimization, 1998
- Parallel Application Scheduling on Networks of WorkstationsJournal of Parallel and Distributed Computing, 1997
- Metacomputing to overcome the power limits of a single machinePublished by Springer Nature ,1997
- A Model for Speedup of Parallel ProgramsPublished by Defense Technical Information Center (DTIC) ,1997
- A Parallel Workload Model and its Implications for Processor AllocationPublished by Defense Technical Information Center (DTIC) ,1996
- Overview of the I-Way: Wide-Area Visual SupercomputingThe International Journal of Supercomputer Applications and High Performance Computing, 1996
- Job Scheduling Strategies for Parallel ProcessingPublished by Springer Nature ,1996
- Job characteristics of a production parallel scientific workload on the NASA Ames iPSC/860Published by Springer Nature ,1995
- A case for NOW (Networks of Workstations)IEEE Micro, 1995
- A Characterization of the Variation in Time of Workload Arrival PatternsIEEE Transactions on Computers, 1985