Cost and Performance of a Membrane Pilot Plant
- 1 November 1989
- journal article
- research article
- Published by Wiley in Journal AWWA
- Vol. 81 (11) , 52-60
- https://doi.org/10.1002/j.1551-8833.1989.tb03307.x
Abstract
The cost and effectiveness of trihalomethane (THM) control and potable water production by a membrane process were investigated during a one‐year project at Flagler Beach, Fla., where the feedwater was a highly organic groundwater. Results of the study showed that the membrane system could control the formation of THMs for an extended period, producing a finished water that exceeded quality and quantity requirements. Construction and operating costs for a membrane plant at Flagler Beach would be about the same as for a conventional softening plant—but the finished water would be of a superior quality. The membrane plant was observed to be less labor intensive and easier to operate than a softening plant.Keywords
This publication has 4 references indexed in Scilit:
- Applying Membrane Processes to Groundwater Sources for Trihalomethane Precursor ControlJournal AWWA, 1987
- Pilot field test Data for prototype ultra low pressure reverse osmosis elementsDesalination, 1985
- Desalting water in FloridaJournal AWWA, 1983
- Testing the membrane plugging factor in reverse osmosisJournal AWWA, 1982