Membrane Compliance and Liquefaction of Sluiced Gravel Specimens
- 1 June 1992
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Geotechnical Engineering
- Vol. 118 (6) , 856-872
- https://doi.org/10.1061/(asce)0733-9410(1992)118:6(856)
Abstract
No abstract availableThis publication has 6 references indexed in Scilit:
- A Nondestructive, Specimen-Specific Method for Measurement of Membrane Penetration in the Triaxial TestGeotechnical Testing Journal, 1989
- An Alternative Method for Determining the Membrane Penetration Correction CurveGeotechnical Testing Journal, 1987
- Design Problems in Soil LiquefactionJournal of Geotechnical Engineering, 1987
- The Borah Peak, Idaho Earthquake of October 28, 1983—LiquefactionEarthquake Spectra, 1985
- Effects of System Compliance on Liquefaction TestsJournal of the Geotechnical Engineering Division, 1978
- Effects of the earthquake of March 27, 1964, at Valdez, AlaskaProfessional Paper, 1966