Heuristic methods for flexible flow line scheduling
- 31 December 1987
- journal article
- Published by Elsevier in Journal of Manufacturing Systems
- Vol. 6 (4) , 299-314
- https://doi.org/10.1016/0278-6125(87)90006-9
Abstract
No abstract availableThis publication has 7 references indexed in Scilit:
- A Rule-Based System to Schedule ProductionComputer, 1986
- Scheduling algorithms for flexible flow linesIBM Journal of Research and Development, 1985
- Optimization by Simulated AnnealingScience, 1983
- A state-of-the-art survey of dispatching rules for manufacturing job shop operationsInternational Journal of Production Research, 1982
- Heuristic-Programming Solution of a Flowshop-Scheduling ProblemOperations Research, 1974
- An Effective Heuristic Algorithm for the Traveling-Salesman ProblemOperations Research, 1973
- An Efficient Heuristic Procedure for Partitioning GraphsBell System Technical Journal, 1970