Two criteria for the selection of assembly plans: maximizing the flexibility of sequencing the assembly tasks and minimizing the assembly time through parallel execution of assembly tasks
- 1 January 1991
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Robotics and Automation
- Vol. 7 (5) , 626-633
- https://doi.org/10.1109/70.97874
Abstract
No abstract availableThis publication has 7 references indexed in Scilit:
- Parts entropy methods for robotic assembly system designPublished by Institute of Electrical and Electronics Engineers (IEEE) ,2005
- Computer-aided assembly sequence editing and choice: editing criteria, bases, rules, and techniquePublished by Institute of Electrical and Electronics Engineers (IEEE) ,2002
- SAFIR: flexible multi-robots assembly systemPublished by Institute of Electrical and Electronics Engineers (IEEE) ,2002
- A correct and complete algorithm for the generation of mechanical assembly sequencesIEEE Transactions on Robotics and Automation, 1991
- AND/OR graph representation of assembly plansIEEE Transactions on Robotics and Automation, 1990
- Evaluation Functions For Assembly Sequence PlanningPublished by SPIE-Intl Soc Optical Eng ,1989
- Simplified generation of all mechanical assembly sequencesIEEE Journal on Robotics and Automation, 1987