Technical Note—Mathematical Pitfalls in the One Machine Multiproduct Economic Lot Scheduling Problem
- 1 April 1983
- journal article
- Published by Institute for Operations Research and the Management Sciences (INFORMS) in Operations Research
- Vol. 31 (2) , 401-405
- https://doi.org/10.1287/opre.31.2.401
Abstract
We consider a group of products sharing the same piece of production equipment, and show that two mathematical problem formulations in the literature are ill-posed. In both cases, the infimum of the cost function occurs at a boundary point that is not feasible.Keywords
This publication has 0 references indexed in Scilit: