Abstract
This paper considers periodic and sequential preventive maintenance (PM) policies for the system with minimal repair at failure: the PM is done (i) at periodic times kx and (ii) at constant intervals xk (k = 1, 2, ···, N). The system has a different failure distribution between PM'S and is replaced at the Nth PM. The optimal policies which minimize the expected cost rates are discussed. The optimal x and N of periodic PM and {xk} of sequential PM are easily computed in a Weibull distribution case.

This publication has 3 references indexed in Scilit: