Research issues for multi-level lot sizing in MRP systems
- 1 February 1982
- journal article
- Published by Wiley in Journal of Operations Management
- Vol. 2 (2) , 113-123
- https://doi.org/10.1016/0272-6963(82)90027-4
Abstract
No abstract availableKeywords
This publication has 18 references indexed in Scilit:
- Heuristic Techniques for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures: Theory and Empirical ComparisonsManagement Science, 1981
- Production and Sales Planning with Limited Shared Tooling at the Key OperationManagement Science, 1981
- THE MEASUREMENT AND OPERATING BENEFITS OF COMPONENT PART COMMONALITYDecision Sciences, 1981
- HEURISTIC LOT‐SIZING PERFORMANCE IN A ROLLING‐SCHEDULE ENVIRONMENT*Decision Sciences, 1980
- A comparison of MRP lot sizing methods considering capacity change costsJournal of Operations Management, 1980
- Research in Operations ManagementJournal of Operations Management, 1980
- The transport revolutionPublished by Cambridge University Press (CUP) ,1980
- HEURISTIC LOT‐SIZING AND SEQUENCING RULES IN A MULTISTAGE PRODUCTION‐INVENTORY SYSTEMDecision Sciences, 1979
- MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTYDecision Sciences, 1976
- The Economic Lot Sizes in Multistage Production SystemsA I I E Transactions, 1970