Variable sampling intervals for multiparameter shewhart charts

Abstract
This paper considers the problem of using control charts to simultaneously monitor more than one parameter with emphasis on simultaneously monitoring the mean and variance. Fixed sampling interval control charts are modified to use variable sampling intervals depending on what is being observed from the data. Two basic strategies are investigated. One strategy uses separate control charts for each parameter, A second strategy uses a proposed single combined statistic which is sensitive to shifts in both the mean and variance. Each procedure is compared to corresponding fixed interval procedures. It is seen that for both strategies the variable sampling interval approach is substantially more efficient than fixed interval procedures.

This publication has 3 references indexed in Scilit: