Variable sampling intervals for multiparameter shewhart charts
- 1 January 1989
- journal article
- research article
- Published by Taylor & Francis in Communications in Statistics - Theory and Methods
- Vol. 18 (5) , 1769-1792
- https://doi.org/10.1080/03610928908830000
Abstract
This paper considers the problem of using control charts to simultaneously monitor more than one parameter with emphasis on simultaneously monitoring the mean and variance. Fixed sampling interval control charts are modified to use variable sampling intervals depending on what is being observed from the data. Two basic strategies are investigated. One strategy uses separate control charts for each parameter, A second strategy uses a proposed single combined statistic which is sensitive to shifts in both the mean and variance. Each procedure is compared to corresponding fixed interval procedures. It is seen that for both strategies the variable sampling interval approach is substantially more efficient than fixed interval procedures.Keywords
This publication has 3 references indexed in Scilit:
- $\overline{X}$ Charts with Variable Sampling IntervalsTechnometrics, 1988
- Economically optimal markovian sampling policies for process monitoringCommunications in Statistics - Theory and Methods, 1986
- A Markovian Sampling Policy Applied to Water Quality Monitoring of StreamsPublished by JSTOR ,1970