Commissioning of KEKB bunch feedback systems
- 20 January 2003
- proceedings article
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- Vol. 2, 1138-1140
- https://doi.org/10.1109/pac.1999.795474
Abstract
Commissioning of KEKB started at the end of the lastyear. In the early stages of the commissioning, we observedtransverse instabilities in both rings and started tuning of thebunch feedback systems. Even though the tuning is now atthe initial stage, the feedback systems are contributing toan increase of the maximum storable currents in the KEKBrings. Feedback-related systems, tune meters and bunchcurrentmonitors, are also working well.Keywords
This publication has 1 reference indexed in Scilit:
- Study of transverse bunch-by-bunch feedback systems based on the two tap FIR filterNuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment, 1998