Two-machine group scheduling problem with blocking and anticipatory setups
- 1 September 1993
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 69 (3) , 467-481
- https://doi.org/10.1016/0377-2217(93)90029-m
Abstract
No abstract availableThis publication has 36 references indexed in Scilit:
- Scheduling Production of Common Components at a Single FacilityIIE Transactions, 1990
- A graph partitioning procedure for machine assignment and cell formation in group technology†International Journal of Production Research, 1990
- Scheduling groups of jobs in the two-machine flow shopMathematical and Computer Modelling, 1990
- Scheduling The Production Of Components At A Common FacilityIIE Transactions, 1988
- ZODIAC—an algorithm for concurrent formation of part-families and machine-cellsInternational Journal of Production Research, 1987
- A within-cell utilization based heuristic for designing cellular manufacturing systemsInternational Journal of Production Research, 1987
- MODROC: an extension of rank order clustering for group technologyInternational Journal of Production Research, 1986
- Direct clustering algorithm for group formation in cellular manufactureJournal of Manufacturing Systems, 1982
- The Complexity of Flowshop and Jobshop SchedulingMathematics of Operations Research, 1976
- A Heuristic Algorithm for the n Job, m Machine Sequencing ProblemManagement Science, 1970