High-Voltage Impulse Tests in Substations [includes discussion]
- 1 April 1954
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems
- Vol. 73 (2) , 210-222
- https://doi.org/10.1109/aieepas.1954.4498811
Abstract
No abstract availableKeywords
This publication has 6 references indexed in Scilit:
- Measuring equipment and techniques used for high-voltage impulse tests on lines and substations [includes discussion]Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems, 1954
- High-Voltage Impulse Tests on Transmission Lines [includes discussion]Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems, 1954
- Protective Practices as a Criterion for High-Voltage Transmission Design [includes discussion]Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems, 1954
- Lightning Problems Solved with the Synchronograph [includes discussion]Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems, 1953
- Co-ordination of Lightning Arrester Location with Transformer Insulation LevelTransactions of the American Institute of Electrical Engineers, 1950