A review of the commissioning and initial operation of the NSF tandem accelerator
- 15 February 1984
- journal article
- review article
- Published by Elsevier in Nuclear Instruments and Methods in Physics Research
- Vol. 220 (1) , 54-61
- https://doi.org/10.1016/0167-5087(84)90407-1
Abstract
No abstract availableKeywords
This publication has 4 references indexed in Scilit:
- Stabilisation of an electrostatic generator using a digital computerNuclear Instruments and Methods, 1978
- Laddertron developmentsRevue de Physique Appliquée, 1977
- The nuclear structure facility at DaresburyNuclear Instruments and Methods, 1974
- Design and operation of a charge-state separator based on offset magnetic quadrupolesNuclear Instruments and Methods, 1974