An Evaluation of the Jenike Bunker Design Method
- 1 February 1973
- journal article
- Published by ASME International in Journal of Engineering for Industry
- Vol. 95 (1) , 48-54
- https://doi.org/10.1115/1.3438155
Abstract
Flow blockage in steelworks bunkers is a major source of trouble. The correct design of bunkers to ensure flow would result in reduced capital and operating costs. The Jenike method of bunker design, which claims a solution to this problem, has been critically examined for a range of iron ores using a variable-geometry wedge-shaped bunker. The main conclusion from these experiments is that the Jenike method is valid for dynamic pressure conditions and even shows some over-design. Further experiments using just one iron ore have confirmed the validity for a conical-shaped bunker under similar pressure conditions. The main limitations of the Jenike design method are as follows: (a) It does not provide a design which can accommodate impact filling. In certain cases, especially with conical bunkers, flow blockage can easily occur and (b) It does not provide a design which can be certain of eliminating arching at the transition point of a bunker with surcharge.Keywords
This publication has 0 references indexed in Scilit: