Directions for reactor target design based on the U.S. Heavy Ion Fusion Systems Assessment
- 1 May 1987
- journal article
- research article
- Published by Hindawi Limited in Laser and Particle Beams
- Vol. 5 (3) , 517-524
- https://doi.org/10.1017/s0263034600003001
Abstract
The Heavy-Ion Fusion Systems Assessment project is nearing completion of a two-year effort. The resulting system modelwill be used to set directions for future target design work. Major uncertainties in target design were studied using thecost of electricity as a figure of merit. Net electric power was fixed at 1000 MW to eliminate large effects due to economies of scale. The system is relatively insensitive to target gain, factors of three changes in gain resulting in 8 to 12% changes in electricity cost. Possible increased peak power requirements pose only a small cost risk, but require many more beamlets for transport. A shortening ofthe required ion range causes both cost and beamlet difficulties. A factor of 4 decrease in the required range at a fixed driver energy increases electricity cost by 44% and raises the number of beamlets to 240. Finally, the heavy ion fusion system can accommodate large increases in target costs. Thus, to address the major uncertainties, target design should concentrate on requirements for ion range andpeak driver power.Keywords
This publication has 5 references indexed in Scilit:
- Gain Scaling Relations for Heavy-Ion TargetsFusion Technology, 1986
- Reactor Designs for Heavy-Ion FusionFusion Technology, 1986
- Heavy-Ion Fusion Target Cost ModelFusion Technology, 1986
- A Systems Performance and Cost Model for Heavy Ion FusionFusion Technology, 1986
- A Comparison of the Design and Costs of Induction Linac Drivers for Inertial Fusion Using Ions of Mass 133 and 200Fusion Technology, 1986