Design Strategies for Nutrient Removal Plant
- 1 November 1985
- journal article
- Published by IWA Publishing in Water Science & Technology
- Vol. 17 (11-12) , 233-242
- https://doi.org/10.2166/wst.1985.0235
Abstract
The first full-scale Bardenpho plant in the colder regions of North America was constructed in Kelowna and operated for about two years. The design was based on criteria developed by Barnard (1974) and based on experience of the design of similar plants in South Africa. Maximum flexibility leaving the operator many options for optimization was allowed. Effluent ortho-phosphate, nitrate and ammonia concentration averaged 0.43, 2.05 and 0.78 mg/ℓ respectively over the first year of operation. Operating results are compared with design predictions. Some results are presented and the design was tested using theories developed by Ekama et al (1984) whose models predicted that no phosphate removal would be possible. RESUME La premierè installation de Bardenpho, à grande échelle dans les régions les plus froides de l'Amérique du Nord a été construite à Kelowna et utilisée pendant plus de deux ans. Le dessin était fondé sur les information de Barnard (1974) et basé sur l'expérience du dessin d'installation sembables en Afrique du Sud. L'installation était flexible et laissait à l'opérateur le choix de plusieurs options pour l'optimisation. La concentration de ortho-phosphate, nitrate et ammoniaque avait les valeurs moyennes de 0,43; 2,05 et 0,78 mg/ℓ respectivement pendant la premiére année de travail. Les resultats sont presentés et la dessin a été mis à l'épreuve en utilisant les théories développées par Ekama et al (1984) dont les modèles ont predit. qu' aucun élimination de phosphate serait possible vu le petit réduction de nitrate qui le modèle ont prédit aux températures plus froides.Keywords
This publication has 0 references indexed in Scilit: