A floating mark scans the Australian Alps
- 1 September 1959
- journal article
- research article
- Published by Taylor & Francis in Australian Surveyor
- Vol. 17 (7) , 405-416
- https://doi.org/10.1080/00050326.1959.10440472
Abstract
The Snowy Mountains Scheme, the largest engineering project ever undertaken in Australia, is being constructed (a) to produce Hydro-electric power to meet increasing demands for industrial expansion, and (b) to provide Irrigation water for the dry inland plains in order to increase food and other primary production.Keywords
This publication has 1 reference indexed in Scilit:
- Ground-photogrammetry in AustraliaAustralian Surveyor, 1952