A metkod of scheduling optimum operation of Ontario Hydro's Sir Adam Beck-Niagara generating station
- 1 April 1958
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems
- Vol. 77 (3) , 981-989
- https://doi.org/10.1109/aieepas.1958.4500078
Abstract
No abstract availableKeywords
This publication has 3 references indexed in Scilit:
- Electrical Features of the Sir Adam Beck - Niagara Generating Station No. 2; The Hydro-Electric Power Commission of Ontario [includes discussion]Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems, 1956
- The Use of Storage Water in a Hydroelectric SystemJournal of the Operations Research Society of America, 1955
- Short-Range Economic Operation of a Combined Thermal and Hydroelectric Power System [includes discussion]Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems, 1953