Determining the number of kanbans in a multiproduct, multistage production system
- 1 May 1991
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 29 (5) , 881-895
- https://doi.org/10.1080/00207549108930108
Abstract
Significant reductions in setup and lead times reported by the Japanese have led Western manufacturers to rethink the need for complex computer-based MRP systems. Consequently, many of these firms have adopted some form of kanban for shop floor control. In this paper, a planning model is developed to assist line managers in determining an optimal kanban policy at each workstation. The objective is to work within the capacity of the system to balance cost and service over the planning horizon. The model takes the form of a mixed integer linear program, and is solved with standard techniques. When no shortages are permitted, a number of alternative formulations are introduced that sharply reduce the computational burden. Results are presented for an example based on the assembly of printed wire boards at Texas Instruments' Austin plant.Keywords
This publication has 10 references indexed in Scilit:
- Batching Policy in Kanban systemsJournal of Manufacturing Systems, 1989
- Optimal Cycle Times in a Two-Stage Serial System With Set-Up and Inventory CostsIIE Transactions, 1989
- Kanban Controlled Pull Systems: An Analytic ApproachManagement Science, 1989
- A Mathematical Programming Approach to a Deterministic Kanban SystemManagement Science, 1987
- An Efficient Decomposition Method for the Approximate Evaluation of Tandem Queues with Finite Storage Space and BlockingOperations Research, 1987
- Kanban, MRP, and Shaping the Manufacturing EnvironmentManagement Science, 1987
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem ReductionManagement Science, 1983
- Applications of Single-Card and Dual-Card KanbanInterfaces, 1983
- Desiǵn and analysis of Pull System, a method of multi-staǵe production controlInternational Journal of Production Research, 1981
- Toyota production system and Kanban system Materialization of just-in-time and respect-for-human systemInternational Journal of Production Research, 1977