A constraint-based perspective in resource constrained project scheduling
- 1 March 1994
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 32 (3) , 693-705
- https://doi.org/10.1080/00207549408956961
Abstract
In this study, a new heuristic approach to the resource constrained project scheduling problem is introduced. This approach, which is called local constraint based analysis (LCBA), is more robust than the dispatching rules found in the literature, since it does not depend on an a priori insight as do the dispatching rules. LCBA consists of the application of local essential conditions which respect the current temporal and resource constraints to generate a necessary sequence of activities at a scheduling decision time point in a single-pass parallel scheduling algorithm. LCBA is a time efficient procedure due to the localized aspect with which the activities are handled. Only the activities which are schedulable at the current scheduling time are considered for the application of the essential conditions. LCBA is tested against well-known rules from the literature and some recently developed rules. This testing is done using a set of problems of a special design and also a set of optimally solved problems from a recent benchmark in the literature. It is observed that near optimal time efficient solutions are obtained by LCBA and the procedure's performance is considerably better than that of the dispatching rules.Keywords
This publication has 29 references indexed in Scilit:
- A new approach for project scheduling with a limited resourceInternational Journal of Production Research, 1991
- A new heuristic for project scheduling with a single resource constraintComputers & Industrial Engineering, 1990
- Some efficient multi-heuristic procedures for resource-constrained project schedulingEuropean Journal of Operational Research, 1990
- Heuristic Performance and Network/Resource Characteristics in Resource-constrained Project SchedulingJournal of the Operational Research Society, 1989
- USING A LATE‐START RESOURCE‐CONSTRAINED PROJECT SCHEDULE TO IMPROVE PROJECT NET PRESENT VALUE*Decision Sciences, 1987
- Two level heuristic for the resource constrained scheduling problemInternational Journal of Production Research, 1986
- Multiple Resource–Constrained Scheduling Using Branch and BoundA I I E Transactions, 1978
- Scheduling a Project Under Multiple Resource Constraints: A Zero-One Programming ApproachA I I E Transactions, 1976
- Project scheduling: The effects of problem structure on heuristic performanceNaval Research Logistics Quarterly, 1976
- On Resource Allocation in Project NetworksJournal of the Operational Research Society, 1972