A new welder busway distribution system
- 1 July 1960
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in Transactions of the American Institute of Electrical Engineers, Part II: Applications and Industry
- Vol. 79 (3) , 203-215
- https://doi.org/10.1109/tai.1960.6371667
Abstract
THE OHIO Stamping Plant of Chrysler. Corporation at Twinsburg, Ohio, covers an area of 1,500,000 sq ft (square feet), approximately 34 acres. Power is supplied by the Ohio Edison Company to supply the great number of motor loads and so forth for the heavy presses and other manufacturing equipment in the plant. The estimated short-circuit duty is 2,500,000 kva, based on long-range future plans. The estimated initial short-circuit duty is 600,000 kva 3 phase symmetrical.Keywords