Design and construction of 4 × 1440 t/day MSF plants at Brindisi's power station (Italy): Acid / antiscale additive treatment for 100°C top brine temperature.
- 1 December 1987
- journal article
- Published by Elsevier in Desalination
- Vol. 66, 109-118
- https://doi.org/10.1016/0011-9164(87)90198-6
Abstract
No abstract availableKeywords
This publication has 0 references indexed in Scilit: