Simulation studies in job shop scheduling—II: Performance of priority rules
- 31 December 1984
- journal article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 8 (2) , 95-105
- https://doi.org/10.1016/0360-8352(84)90002-0
Abstract
No abstract availableKeywords
This publication has 18 references indexed in Scilit:
- Due dates in job shop schedulingInternational Journal of Production Research, 1976
- The impact of advancing due dates in a pure job shopInternational Journal of Production Research, 1975
- The Sensitivity of the Relative Effectiveness of Job Shop Dispatching Rules with Respect to Various Arrival DistributionsA I I E Transactions, 1974
- The development and evaluation of a cost‐based composite scheduling ruleNaval Research Logistics Quarterly, 1974
- A Dispatching Methodology for Balancing Workload Assignments in a Job Shop Production FacilityA I I E Transactions, 1972
- Priority Scheduling and Inventory Control in Job Lot Manufacturing SystemsA I I E Transactions, 1972
- A Simulation Study of Sequencing in Batch ProductionJournal of the Operational Research Society, 1968
- A MODIFIED SI RULE IN JOB SHOP SCHEDULINGInternational Journal of Production Research, 1968
- JOB SHOPS SCHEDULING WITH DUE DATESInternational Journal of Production Research, 1967
- Heuristics in Job Shop SchedulingManagement Science, 1966