Stochastic network project scheduling with non-consumable limited resources
- 10 January 1997
- journal article
- Published by Elsevier in International Journal of Production Economics
- Vol. 48 (1) , 29-37
- https://doi.org/10.1016/s0925-5273(96)00019-9
Abstract
No abstract availableThis publication has 24 references indexed in Scilit:
- On-line Control Model for Cost-simulation Network ProjectsJournal of the Operational Research Society, 1996
- Practical Use of Distributions in Network AnalysisJournal of the Operational Research Society, 1992
- Scheduling under a Non-renewable Resource ConstraintJournal of the Operational Research Society, 1991
- A nonlinear minimax allocation problem with multiple knapsack constraintsOperations Research Letters, 1991
- Resource constrained project crashingOmega, 1989
- On the Distribution of Activity Time in PERTJournal of the Operational Research Society, 1988
- A comparison between the VERT program and other methods of project duration estimationOmega, 1987
- A Note on the Generation of Project Network DiagramsJournal of the Operational Research Society, 1981
- Project Scheduling with Resource Constraints Using Branch and Bound MethodsJournal of the Operational Research Society, 1976
- Resource-constrained Project Scheduling — The State of the ArtJournal of the Operational Research Society, 1972