Optimal Two-Stage Production Scheduling with Setup Times Separated
- 1 September 1979
- journal article
- Published by Taylor & Francis in A I I E Transactions
- Vol. 11 (3) , 261-263
- https://doi.org/10.1080/05695557908974469
Abstract
No abstract availableThis publication has 4 references indexed in Scilit:
- Special cases of the flow‐shop problemNaval Research Logistics Quarterly, 1977
- Optimal schedules for special structure flowshopsNaval Research Logistics Quarterly, 1975
- Sequencing n Jobs on Two Machines with Arbitrary Time LagsManagement Science, 1959
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954