Construction and commissioning of a 215-m-long beamline at SPring-8
- 1 July 2001
- journal article
- Published by Elsevier in Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
- Vol. 467-468, 682-685
- https://doi.org/10.1016/s0168-9002(01)00445-4
Abstract
No abstract availableKeywords
This publication has 6 references indexed in Scilit:
- Vacuum system of X-ray beamlines of SPring-8Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment, 2001
- Transport channels of X-ray beamlines at SPring-8Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment, 2001
- SPring-8 standard x-ray monochromatorsPublished by SPIE-Intl Soc Optical Eng ,1999
- Present Status and Performance of SPring-8 Front EndsJournal of Synchrotron Radiation, 1998
- Standard Transport Channels of X-ray Beamlines at SPring-8Journal of Synchrotron Radiation, 1998
- Optical Coherence and Quantum OpticsPublished by Cambridge University Press (CUP) ,1995