Single machine scheduling research
- 1 January 1987
- Vol. 15 (3) , 207-227
- https://doi.org/10.1016/0305-0483(87)90071-5
Abstract
No abstract availableKeywords
This publication has 165 references indexed in Scilit:
- Minimizing the Range of Lateness on a Single MachineJournal of the Operational Research Society, 1984
- Optimal Due-Date Determination and Sequencing of n Jobs on a Single MachineJournal of the Operational Research Society, 1984
- Scheduling Jobs of Equal Durations with Tardiness Costs and Resource LimitationsJournal of the Operational Research Society, 1978
- Optimal Strategies for a Class of Constrained Sequential ProblemsThe Annals of Statistics, 1977
- Scheduling Tasks with Nonuniform Deadlines on Two ProcessorsJournal of the ACM, 1976
- Algorithms for Scheduling Independent TasksJournal of the ACM, 1976
- One machine sequencing to minimize mean flow time with minimum number tardyNaval Research Logistics Quarterly, 1975
- An experimental comparison of solution algorithms for the single‐machine tardiness problemNaval Research Logistics Quarterly, 1974
- A Heuristic Method for a Job-Scheduling ProblemJournal of the Operational Research Society, 1966
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954