Optimal Application of Major Electrical Equipment to Generating Station Auxiliary Systems

Abstract
The problem of coordinating major electrical equipment in generating station auxiliary systems has been addressed. The solution discussed involves a designer oriented computer-aided optimization technique for measuring the sensitivities between the system operating limits and performance requirements. An illustrative example set of calculations, based on Detroit Edison's Fermi-2 nuclear unit, are shown in some detail.

This publication has 1 reference indexed in Scilit: