Scheduling with Computer-Interpretable Construction Method Models
- 1 December 1996
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 122 (4) , 337-347
- https://doi.org/10.1061/(asce)0733-9364(1996)122:4(337)
Abstract
Current scheduling tools require the manual translation of design information to activities and typically do not provide dynamic links between cost estimates and corresponding schedules. To take advantage of the increasingly electronic and object-based descriptions of designs, schedules, and estimates, integration mechanisms that translate design descriptions into schedule and cost views of projects are needed. This paper presents computer-interpretable models for the representation of construction methods as one such a mechanism. These models support the automated generation of realistic construction schedules. Methods elaborate higher-level activities into appropriate lower-level activities to link schedules of various levels of detail. Five attributes define a construction method: domain, constituting activities, activity sequencing, constituting objects, and resource requirements. These construction method models can act as templates to capture production and scheduling knowledge specific to firms and projects. We illustrate the use and implementation of these models by scheduling the construction of a small masonry structure. These models assist architects, owners, and contractors in studying cost and schedule implications of design and construction alternatives.Keywords
This publication has 13 references indexed in Scilit:
- MDA Planner: Interactive Planning Tool Using Product Models and Construction MethodsJournal of Computing in Civil Engineering, 1994
- RATAS Project—Developing an Infrastructure for Computer‐Integrated ConstructionJournal of Computing in Civil Engineering, 1994
- Interpretation Objects for Multi-Disciplinary DesignPublished by Springer Nature ,1994
- The Development of the Construction Engineer: Past Progress and Future ProblemsJournal of Construction Engineering and Management, 1991
- Sequencing Knowledge for Construction SchedulingJournal of Construction Engineering and Management, 1991
- Integrating CAD with Construction‐Schedule GenerationJournal of Computing in Civil Engineering, 1991
- Assembly planning based on geometric reasoningComputers & Graphics, 1990
- Expert System for Construction PlanningJournal of Computing in Civil Engineering, 1987
- ‘Intelligent’ construction time and cost analysisConstruction Management and Economics, 1986
- Construction Planning—Beyond the Critical PathJournal of the Construction Division, 1980