Do today's projects need powerful network planning tools?
- 1 October 1991
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 29 (10) , 1969-1978
- https://doi.org/10.1080/00207549108948062
Abstract
Since the 1960s, when network planning tools were ‘invented’, management has been pressed to use the methodologies embedded in the Critical Path Method (CPM) and in the Project Evaluation and Review Technique (PERT). Gradually benefits have been seen and these planning tools are now more widely used. Even so, there can be compelling reasons to use more comprehensive tools in order to model a greater degree of uncertainty than is possible with CPM or PERT. This situation may arise for instance when competition propels a firm into tight time, cost and performance contracts. In this paper we will use a compressed network to illustrate how three planning tools—CPM, PERT and the newer Venture and Evaluation and Review Technique (VERT)—yield different results. So different in fact that we suggest the use of CPM and PERT can be very misleading. And used in too cavalier a fashion, these methods may present to management an over-confident prediction of the termination of the project. But the more difficult to use VERT could help unravel many probabilistic and stochastic choices that occur in real networks. Furthermore, this technique can offer a superior estimate of the final turn-around time and cost of the project.Keywords
This publication has 2 references indexed in Scilit:
- A comparison between the VERT program and other methods of project duration estimationOmega, 1987
- An Analytical Study of the PERT AssumptionsOperations Research, 1964