Conceptual Construction Process Model
- 1 June 1988
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 114 (2) , 294-310
- https://doi.org/10.1061/(asce)0733-9364(1988)114:2(294)
Abstract
Managers have tried several project‐specific methods to improve declining construction productivity with mixed results. Most solutions have focused on supporting craftsmen in the field. This paper presents a conceptual model of the construction process, defining goals for management and control systems to support the craftsman's needs in the field. This model comprises four generic flow charts with rules that govern them. The first defines the needs of the craftsman. The second specifies the support functions required from a site organization, while the third defines all of the other major site‐related functions. Finally, the limits of site management control are specified. Craft support is the acid test of a functioning system; thus validation of the model focused on the first two flow charts. Analysis of five groups of similar projects showed that the closer a site organization is to the conceptual model, the better its performance. Site evaluation tools are presented.Keywords
This publication has 6 references indexed in Scilit:
- Storage of materialsPublished by Elsevier ,1981
- Participative Decision Making in ConstructionJournal of the Construction Division, 1977
- The ongoing feedback system: Experimental with a new managerial toolOrganizational Dynamics, 1976
- Organization Design: An Information Processing ViewInterfaces, 1974
- A Program for Research on Management Information SystemsManagement Science, 1973
- The new science of management decision.Published by American Psychological Association (APA) ,1960