A note on the flow time and the number of tardy jobs in stochastic open shops
- 1 October 1984
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 18 (1) , 81-85
- https://doi.org/10.1016/0377-2217(84)90265-0
Abstract
No abstract availableKeywords
This publication has 5 references indexed in Scilit:
- Stochastic Scheduling with Release Dates and Due DatesOperations Research, 1983
- Minimizing expected makespan in stochastic open shopsAdvances in Applied Probability, 1982
- Complexity and Solutions of Some Three-Stage Flow Shop Scheduling ProblemsMathematics of Operations Research, 1982
- Minimizing Maximum Lateness in a Two-Machine Open ShopMathematics of Operations Research, 1981
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a SurveyPublished by Elsevier ,1979