Due-Dates and Instantaneous Load in the One-Machine Shop
- 1 December 1976
- journal article
- Published by Institute for Operations Research and the Management Sciences (INFORMS) in Management Science
- Vol. 23 (4) , 444-450
- https://doi.org/10.1287/mnsc.23.4.444
Abstract
The due-date assignment problem occurs when due-dates are assigned within, rather than outside, a job shop. This study explores the importance of instantaneous and future shop loads in setting due-dates in shops operating under due-date dependent queue discipline. The assignment of due-dates to arriving jobs in an m-machine shop is formulated as a stochastic dynamic programming problem in the first part of this study. A computational experiment using dynamic programming is performed in the second part and due-dates are developed for specific instantaneous load conditions in a simulated one-machine shop. The importance of instantaneous and future shop loads for assigning due-dates in a one-machine shop, with constant interarrivals and exponential service times, is shown.Keywords
This publication has 0 references indexed in Scilit: