Use of Data Oil the Build-up of Bottom-hole Pressures
- 1 December 1937
- journal article
- Published by Society of Petroleum Engineers (SPE) in Transactions of the AIME
- Vol. 123 (01) , 44-48
- https://doi.org/10.2118/937044-g
Abstract
In preparing a well for pumping, observations are often made of the fluidlevel in the well bore or bottom-hole pressures at various times beforeequilibrium has set in. From a qualitative point of view one may immediatelyinfer that if the rise in the bottom-hole pressure or fluid level is rapid thepermeability of the sand about the well bore is large, and converse conclusionmay be drawn if the rise is slow. However, a more quantitative estimate willgive additional information of value, as will be shown in this paper. To derive such an estimate we may proceed as follows. Let h be the fluidheight, above the sand face, at time t, and let "Yo be the average densityof the fluid that enters the bore. The bottom-hole pressure, for a fluid heighth will therefore be p = "Yogh, neglecting, of course, the friction drop inthe well bore, while the fluid is rising, as may be justifiably done for mostpumping wells. If a is the free area of the open-flow string-assumed to be uniform-the rate ofproduction from the sand during the rise of fluid will be:ah a apQ = a- = - - = f(p)at "Yog dt where the last part of the equation merely indicates that, in general, theproduction rate Q must be considered as a function of the back pressure, and isdetermined by it alone. In fact, equation 1 shows that if the rate of rise ofthe pressure or fluid level is determined as a function of the height of rise, or p, for a number of values of the latter, this functional relation between Qand p will be immediately given. Conversely, if we know this functional relation, the rate of increase of p or hmay be predicted, or, by observing the rate of rise of p or h some of theconstants of the sand may be determined.Keywords
This publication has 0 references indexed in Scilit: