Risks and Guarantees in BOT Tender
- 1 June 1995
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 121 (2) , 183-188
- https://doi.org/10.1061/(asce)0733-9364(1995)121:2(183)
Abstract
The build-operate-transfer (BOT) concept is being used increasingly by governments across a number of infrastructural sectors in their drive to privatize major public projects. Governments see BOT schemes as a method of financing the construction of urgently needed infrastructure projects without direct sovereign guarantee of the loans and with all the technical and financial risks being borne by the private promoter. This paper is concerned with the issues of risks to be retained by the promoter and the guarantees to be offered to the government in the selection process of a BOT tender. It is critical for the promoter to understand that the ability to retain risks and offer guarantees does provide the competitive advantage in being awarded the concession.Keywords
This publication has 7 references indexed in Scilit:
- Critical Success Factors in Winning BOT ContractsJournal of Construction Engineering and Management, 1992
- Financial and contractual aspects of build-operate-transfer projectsInternational Journal of Project Management, 1991
- BOT projects: Risks and securitiesConstruction Management and Economics, 1990
- Entrepreneurs in Engineering OrganizationsJournal of Management in Engineering, 1990
- Comparative Study of BOT ProjectsJournal of Management in Engineering, 1990
- 1. Channel Tunnel — the early stagesPublished by Thomas Telford Ltd. ,1989
- Research Methodologies for Contingency Approaches to Business StrategyAcademy of Management Review, 1983