Status of KEK TRISTAN Project

Abstract
Status of the KEK TRISTAN project, the Phase I of which has been approved since 1981, is reported with an emphasis on its accelerator design and construction. The design of accelerator complex has mostly been fixed. Construction of accelerator enclosure and production of accelerator components are under way with a target day for the first e+ e- collisions in 1986.

This publication has 7 references indexed in Scilit: