Scheduling the fabrication and assembly of components in a two-machine flowshop
- 1 February 1999
- journal article
- research article
- Published by Taylor & Francis in IIE Transactions
- Vol. 31 (2) , 135-143
- https://doi.org/10.1080/07408179908969812
Abstract
In this paper we study the problem of scheduling the fabrication and assembly of components in a two-machine flowshop so as to minimize the makespan. Each job consists of a component unique to that job and a component common to all jobs. Both the unique and the common components are processed on the first machine. While the unique components are processed individually, the common components are processed in batches and a setup is needed to form each batch. The assembly operations of a job is performed on the second machine, and can only begin when both components for the job are available. We first show that the problem is NP-complete with either batch availability or item availability for the common components. We identify several properties of an optimal solution to the problem, and some polynomially solvable special cases.Keywords
This publication has 8 references indexed in Scilit:
- Economic scheduling of products with N components on a single machineEuropean Journal of Operational Research, 1997
- The Two-Stage Assembly Scheduling Problem: Complexity and ApproximationOperations Research, 1995
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling ProblemManagement Science, 1993
- Batch sizing and job sequencing on a single machineAnnals of Operations Research, 1990
- Optimal Scheduling of Products with Two Subassemblies on a Single MachineOperations Research, 1989
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a SurveyPublished by Elsevier ,1979
- Reducibility among Combinatorial ProblemsPublished by Springer Nature ,1972
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954