Abstract
During 1988 the first positive steps were taken to proceed with the design and construction of a neutron capture therapy facility on the High Flux Reactor (HFR) at Petten. The immediate aim is to realise within a short time (summer 1989), an epithermal neutron beam...

This publication has 0 references indexed in Scilit: